Ynni Consulting provides transient insulation coordination analysis by numerical simulations, taking into account the entire network model and considering its operating modes. The studies consist to explore the overvoltage which may occur at equipment terminals considering the high frequency model of each network component and if needed, we can advise design modifications or recommend some actions to resolve the issue, including assess the adequacy of the designated surge arresters to maintain overvoltage level below the equipment maximum protection level.

Depending on the nature of the project (GIS, AIS, Transmission lines, Cables…etc.) and the frequency and time domain performance, the studies to be conducted to demonstrate the compliance of the system with international standards and client requirements are:

Slow Front Overvoltage – SFO

  • Line Switching (close/open)

  • Fault and fault clearance

  • Transformer Switching

  • Reactors/Capacitors Switching

Temporary Overvoltage – TOV

  • Earth faults

  • Load rejections

  • Resonance and Ferro-resonance

  • Ferranti effect

Fast Front Overvoltage – FFO

  • Direct Lightning Strokes

  • Indirect Lightning Strokes

Very Fast Transient Overvoltage – VFTO

  • GIS Disconnector switching

  • GIS Circuit Breaker switching

TOOLS

Different tools can be used according to the subject to be studied and customer requirements.

  • PSCAD

  • ETAP

  • ATP – EMTP

  • DigSilent Power Factory